TeraWulf Starts Nuclear-Powered Bitcoin Mining With Nearly 8,000 Rigs at Nautilus Facility

Crypto Miner Pow.re Raises $9.2M Series A at $150M Valuation

The Nautilus mine is “the first behind-the-meter bitcoin mining facility of its kind, directly sourcing reliable, carbon free, and 24×7 baseload power from the 2.5GW Susquehanna nuclear generation station in Pennsylvania,” according to TeraWulf. It is a joint venture with Texas energy producer Talen Energy, in which TeraWulf has a 25% interest.

Source link

Be the first to comment

Leave a Reply

Your email address will not be published.


*